Whittier Hospital Medical Center
Hospital in Whittier, CA, Medicare certification number 050735. CMS publishes 53 quality measures for it.
Medicare certification
Provider of Services- CCN
- 050735
- Status
- Active
- Provider type
- Hospital – Short-term
- Listed by Care Compare as
- Acute Care Hospitals
- Ownership
- Proprietary
- Control type
- Private (for profit)
- Participating since
- Nov 1, 2004
- Last certification
- Sep 7, 2018
- Beds
- 178
- Overall star rating
- Address
- 9080 Colima Rd
Whittier, CA 90605
(562) 945-3561
NPI records for this facility 1
-
- General Acute Care Hospital
- Whittier, CA
- NPI 1023000569
Medicare enrollment
Patient survey (HCAHPS) 9
Medicare Care Compare-
Cleanliness - star rating Better4
-
Communication about medicines - star rating Better3
-
Discharge information - star rating Worse2
-
Doctor communication - star rating Worse2
-
Nurse communication - star rating Worse2
-
Overall hospital rating - star rating Worse2
-
Quietness - star rating Worse2
-
Recommend hospital - star rating Worse2
-
Summary star rating Worse2
Complications and deaths 17
Medicare Care Compare-
Abdominopelvic accidental puncture or laceration rate As expected1.03
-
CMS Medicare PSI 90: Patient safety and adverse events composite As expected0.88
-
Death rate for COPD patients As expected8.7
-
Death rate for heart failure patients As expected8.9
-
Death rate for pneumonia patients As expected14.2
-
Death rate for stroke patients As expected10.5
-
Hybrid Hospital-Wide All-Cause Risk Standardized Mortality Rate Worse4.9
-
Iatrogenic pneumothorax rate As expected0.2
-
In-hospital fall-associated fracture rate As expected0.26
-
Perioperative pulmonary embolism or deep vein thrombosis rate As expected3.29
-
Postoperative acute kidney injury requiring dialysis rate As expected1.67
-
Postoperative hemorrhage or hematoma rate As expected2.27
-
Postoperative respiratory failure rate As expected8.99
-
Postoperative sepsis rate As expected5.22
-
Postoperative wound dehiscence rate As expected1.73
-
Pressure ulcer rate As expected0.34
-
Rate of complications for hip/knee replacement patients As expected4.1
Measures CMS does not publish for this facility (3)
Infections 2
Medicare Care Compare-
Catheter Associated Urinary Tract Infections (ICU + select Wards) As expected0.58
-
Clostridium Difficile (C.Diff) Better0.27
Measures CMS does not publish for this facility (4)
Outpatient imaging 1
Medicare Care Compare-
Abdomen CT Use of Contrast Material 0.6
Measures CMS does not publish for this facility (1)
Spending per patient 1
Medicare Care Compare-
Medicare hospital spending per patient (Medicare Spending per Beneficiary) 1.34
Timely and effective care 16
Medicare Care Compare-
Antithrombotic Therapy by End of Hospital Day 2 75
-
Appropriate care for severe sepsis and septic shock 87
-
Average (median) time all patients spent in the emergency department before leaving from the visit, including psychiatric/mental health patients and patients who were transferred to another facility. A lower number of minutes is better 105
-
Average (median) time patients spent in the emergency department before being transferred to another facility. A lower number of minutes is better 455
-
Average (median) time patients spent in the emergency department before leaving from the visit, excluding patients transferred to another facility or psychiatric care/mental health patients. A lower number of minutes is better 103
-
Average (median) time psychiatric/mental health patients spent in the emergency department before leaving from the visit. A lower number of minutes is better 99
-
Discharged on Antithrombotic Therapy 78
-
Endoscopy/polyp surveillance: appropriate follow-up interval for normal colonoscopy in average risk patients 100
-
Healthcare workers given influenza vaccination 90
-
Intensive Care Unit Venous Thromboembolism Prophylaxis 74
-
Left before being seen 0
-
Safe Use of Opioids - Concurrent Prescribing 13
-
Septic Shock 3-Hour Bundle 93
-
Septic Shock 6-Hour Bundle 94
-
Severe Sepsis 3-Hour Bundle 93
-
Severe Sepsis 6-Hour Bundle 99
Measures CMS does not publish for this facility (14)
Unplanned visits 7
Medicare Care Compare-
Heart failure (HF) 30-Day Readmission Rate As expected21.9
-
Hospital return days for heart failure patients 2
-
Hospital return days for pneumonia patients 15.3
-
Pneumonia (PN) 30-Day Readmission Rate As expected16.7
-
Rate of readmission after hip/knee replacement As expected5.5
-
Rate of readmission for chronic obstructive pulmonary disease (COPD) patients As expected19.6
-
Rate of unplanned hospital visits after colonoscopy (per 1,000 colonoscopies) As expected13.2
Measures CMS does not publish for this facility (7)
Related certifications
Sources for this page
- Provider of Services: the certification, provider type, beds and status.
- Medicare Care Compare: the star rating and every measure on this page, with the state and national rates CMS publishes beside them.
- NPPES NPI Registry: the NPI records connected to this certification.